Installation of energy management system for new Turbocore chiller plant. Program VFD’s for two 75hp VSD’s and integration to building automation system. Replacement of controller for central plant, AHU VFD integration and control.
Complete upgrade and replacement of entire Building Automation Controls system. Installed campus-wide Building Automation System, including four chiller plants and 84 new fan coil units.
Campbell Hall Building. Complete addition of new Energy Management System and controls, VAV boxes, air handling unit, chill water and hot water controls.
Installation of steam “bleed-feed” pump control panel and 100-amp local service disconnect. Traced out existing interposing wiring and provided detailed AutoCAD schematic.